Paulo Cleveland Management Changes

Paulo Cleveland Management Changes

Paulo is the second largest commercial heat treater in North America and we are always pleased to mention what they are up to. This press release caught our attention because Andy Muto (who is mentioned) has just been promoted to Operations Manager. Andy is the son of...
Nitriding, Process Methods and Metallurgy

Nitriding, Process Methods and Metallurgy

From international heat treat consultant David Pye pye_d@ymail.com we have an article about Nitriding.  The process Nitriding is a diffusion process and not a deposition process. It is a diffusion procedure that is reliant on a nitrogen source, and a low thermal...
Very Large Plasma Nitrider Installed in China

Very Large Plasma Nitrider Installed in China

Shortly before Christmas we posted a photo of the largest Plasma nitrider RÜBIG Industrial Furnaces had ever built-we now have a few more details. The unit will shortly be in operation at a gear manufacturer in China who is providing ring gears to the wind industry....
Wisconsin Oven – 2018 Year In Review

Wisconsin Oven – 2018 Year In Review

Interesting the number of ovens Wisconsin Oven built in 2018-a quick calculation shows that Wisconsin shipped on average a new piece of equipment every 1.6 days or 4.3 per week which is pretty cool. “2018 was another strong year of growth for Wisconsin Oven. During...